Powered by ProRail

Uncategorized

Work at Waalhaven-Zuid

“It was crazy busy around Waalhaven South,” observes ProRail construction manager André Kop. Among other things, 11 points were replaced at this freight yard in early December. This completed the first work package of the Infrastructure in Order programme in which the infrastructure in the Rotterdam port area is being brought up to speed. In 2021, this meant the renewal of over 50 level crossings, the replacement of 25 points and over 10 kilometres of track.