Powered by ProRail

On Wednesday, July 12, 2023, the temporary modification of the mitigating measures for flushing the newly installed firewater supply has been revoked. Specifically, this means that from this date onwards, the wet firewater supply will be put into operation according to the original design, utilizing a fire truck. The shunting of hazardous substances over track 301a can resume. The use of hydrant tracks remains limited. As a mitigating measure due to ongoing work on emergency provisions, ProRail will keep the fire train operational until the end of 2023, along with the corresponding alarm and deployment procedure.

Blusleiding Waalhaven Zuid-oost operationeel

Updates